The Challenge
Most buildings are continually degrading in their performance, utility costs typically increasing and resources always scarce. Very few will argue that most buildings today have lots of data, neither will they argue that the resource for managing the building has the time to analyse this data. The challenge is then how do we bring these challenges together and deliver a positive, quantifiable business outcome?
We have taken these challenges and turned them into a service that we provide for our clients. We deliver a managed service to your business that optimises the efficiency of your facilities and does so in a way that will typically payback in months’ not years without impact on the occupant comfort.
CASE
STUDIES
Optimised Buildings provides market-leading expertise through products and services that deliver real value to business customers with minimal capital expenditure and a typical ROI in less than 12 months.
Retail
Optimised Buildings were commissioned to reduce the energy consumption by 10%. 73 Superdry stores across the UK now in optimisation program.
RESULTS
16% kWh reduction
£117,811 savings (2018)
Hotel & Leisure
The Radisson Hotel at East Midlands Airport is a 218 bedroom hotel. Through optimisation initiatives significant savings have been achieved.
RESULTS
14% kWh reduction in Electricity consumption
£65,537 savings predicted for first year
RESULTS
41% reduction in Gas
17% reduction in Electricity
Offices
A BREEAM office building that has now been optimised and 19% of the total energy spend saved as a result.
RESULTS
< 6 months ROI
25% reduction in electricity
RESULTS
19% kWh reduction
42% kWh reduction in HVAC
Financial
Optimised Buildings were asked to assess the facility to determine if further energy savings could be achieved through their optimisation proposition.
RESULTS
< 5 months ROI
26% kWh reduction
Hotel & Leisure
The Grosvenor House Hotel in London is a luxury 5-star hotel with over 600 rooms. Through optimisation initiatives significant savings have been achieved.
RESULTS
41% reduction in Gas
17% reduction in Electricity
RESULTS
11.87% overall energy saving
£331,000 annual saving
Offices
Optimisation of the BMS/HVAC across the 1m+ sqft of office space; with Analytics, aM&T, DSM and IoT.
RESULTS
10.17% kWh reduction
ROI of 14.8 Months
Education
Ivanhoe College were challenged with rising energy costs. Optimised Buildings has assisted the College over the past 5 years to reduce these costs.
RESULTS
98 tonnes of carbon saved (Yr1)
26% kWh reduction
Hotel & Leisure
The Hilton Hotel at Canary Wharf has 282 rooms. Through optimisation initiatives significant savings have been achieved.
RESULTS
41% reduction in Gas
17% reduction in Electricity
RESULTS
7% saving of HVAC energy spend
£12,498 annual savings
Retail
Optimisation of the BMS/HVAC across 494 stores throughout the UK; with Analytics, aM&T, DSM and 24/7 Bureau service.
RESULTS
10.13% kWh reduction
ROI of 5.7 Months
RECENT
PROJECTS
Optimised Buildings has recently been awarded the following projects / contracts:
Canadian High Commission have engaged Optimised Buildings through Wates (FM provider) to provide their Trend IQ Vision upgrade along with Optimisation of the BeMS to complement the BeMS Maintenance and Energy Monitoring services.
As part of Bouygues Energy Services contract with Leicestershire County Council we have been contracted to upgrade the controls at the school to deliver long term savings. A Trend BeMS system is being deployed with optimised control strategies.
Precision Polymer Engineering have contracted Optimised Buildings through Octego, (their energy services provider) to deliver a BeMS solution to control and manage their industrial presses at their headquarters facility.
Deployment of an Analytics project to monitor the time schedules and setpoints from the Trend BeMS across the South Kensington estate. It is expected through this project a saving of around 5% will be realised providing a payback in less than 1 year.
A BeMS maintenance contract at one of the largest office buildings in Reading. This follows on from the optimisation works that were undertaken in 2017 and has been let by the incumbent hard services FM provider, NG Bailey
Full optimisation services at the flagship Park Lane Hotel including BeMS upgrades, project works, optimisation strategies and BeMS maintenance. The contract is a 2 year contract to upgrade the dated Honeywell Excel control system to the latest Tridium N4 system. The project has been developed in-conjunction with our partner Octego.
Optimisation of one of the more efficient hotel in the Hilton portfolio. Engagement to optimise the BeMS through the managed service approach via the Optimised Bureau.
Vinci Facilities are delivering services under a PFI contract for 6 schools in Derby, as part of this we have been providing BMS maintenance and energy services for the past 5 years on the Trend system. Under their lifecycle replacement program we have recently upgraded all 6 schools to the latest IQ4 controllers.