Quick Facts

19% kWh reduction in Electricity consumption

42% kWh reduction in HVAC, post optimisation

£28,500 predicted saving for the year

Savings achieved through integration and system optimisation

Full visibility of BeMS, energy consumption and lighting

Background

Housing provider whg manages more than 19,000 homes throughout the West Midlands and 5 commercial buildings. The business moved to 100 Hatherton Street in the heart of Walsall to a new 5,000 sq Metre facility in 2012. The 4 story facility is now the workplace for around 300 colleagues on a daily basis and incorporates a state of the art datacenter. The control systems within the new facility included a Trend IQ3 BeMS, Mitsubishi Split VRF system providing heating/cooling on the floors, a Delmatic lighting control system, 33 sub meters, Solar PV, Variable Speed Drives, Grey water system, but to name a few.

Challenge

whg moved into their new BREEAM Excellent rated building with the expectation that this new green, sustainable building would be cost effective and simple to operate. Within 6 months of occupancy, neither of these objectives had been met.

Optimised Buildings were asked to assess the facility to determine if further energy savings could be achieved through our optimisation proposition. As a result of this whg engaged Optimised Buildings to undertake an audit and it soon became apparent that the building had some fundamental issues. These included poor temperature control in some areas, lack of integration between control systems and high utility costs.

This BREEAM Excellent state of the art building was consuming more than double the kWh/m2 against the CIBSE benchmark for a building of this type.

The building had all the systems and assets, where it fell down was in the integration and contractors appreciation of how these systems needed to work together to deliver a BREEAM Excellent building that whg could operate efficiently and simply.

Solution

Working in conjunction with whg’s newly appointed facility management company, Optimised Buildings took the technical lead in putting together a plan to get the building back on track. Over a 120-day program working with sub-contractors and specialists the various building services systems were back on track and operating correctly. The core of the project consisted of:

 

  • BeMS headend set-up and control strategy modifications

  • Lighting control system interface to BeMS and graphics 

  • Sub metering interface to BeMS

  • AC interface to BeMS and graphics

  • UPS upgrade

  • Implement Optimised aM&T

  • Emergency Lighting integration to BeMS

  • Generator operation and test

  • Optimisation of systems

The Optimised aM&T platform was installed to monitor the energy sub-meters and fiscal meters to ensure that the building remained on track.

The Optimised Bureau is now providing continuous monitoring on behalf of whg to identify anomalies and generate reports, alerts and ongoing energy management advice.

Results

After just 6 months the savings are currently on track to save 19% of the total energy spend compared to the previous year, generating a saving of £28,500 for the year. This saving was generated from HVAC alone, reducing consumption by 42%.

whg Results

If you are to create better returns from your property portfolio, then minimising operational costs is essential. Expert building and utilities management can help you do that, yet cost efficiencies need to be balanced against the need to provide a quality space and environment to tenants that ensures you meet your responsibilities, while creating high occupancy, as well as cost-efficiency. At Optimised Buildings we have pulled together best of breed technologies and services to bring many aspects of managing energy for real estate owners and operators under a single umbrella which we strongly believe will help you on your journey.

About Optimised Buildings

Discover our tailored approach to your energy needs 

Contact or call us on +44(0)333 370 2021

BLACKPOOL

109-112 Lancaster House,

Amy Johnson Way

Blackpool

FY4 2RP

01253 209000

BRISTOL

Kings Court,

87 High Street

Nailsea, Bristol

BS48 1AW

01275 859100

ASHBY DE LA ZOUCH - HQ

1 Ivanhoe Office Park,

Ivanhoe Park Way,

Ashby de la Zouch, Leicestershire LE65 2AB

0333 370 2021

SITTINGBOURNE

The Oast

62 Bell Road

Sittingbourne

Kent ME10 4HE

0333 370 2023

  • Optimised Buildings LinkedIn
  • Optimised Buildings Twitter